|
HOME | NEWS | PEOPLE | LABS | EQUIPMENT | DOCUMENTATION | GAINING ADMITTANCE | CONTACT
|
HVAC System UpdateThe new improvements to the HVAC system are working great. Installation was completed in March 2000 and since then, through two sweltering Pittsburgh summers and a winter, we've enjoyed continuous 68° F ±1° F and 35% ± 3% RH lab conditions. The dual chillers have provided the facility with non-stop 32° F glycol chilled water for dehumidification throughout the past year, an excellent record that is much appreciated in mid-August. The new digital controls are very easy to monitor via the campus facilities network. Archived News Articles: |
|
copyright 2001 Carnegie Mellon |